Individual characteristics:
- Responsibility, initiative;
- Work with significant amounts of information;
- Analytical skills;
- Focus on process optimization;
- Training, the disclosure of additional opportunities.
- The most significant author's works in the field of design:
1. Working documentation: "System of engineering protection structures against groundwater flooding of the territory of the compressor station "Krasnodarskaya" of the gas pipeline "Russia-Turkey"". Reconstruction. 2006. The area of the protected area: 15Ha. Participation in the project by a leading engineer / author of design solutions: from the conclusion of the contract to the commissioning of the facility.
2. Working documentation: "Development of a set of measures for the arrangement of the coastal zone of the Skhodnya River in the city of Moscow in the area between the Hiking passage and the pedestrian bridge", 2008. New construction. Length: 430m. Participation in the project by a leading engineer: from the conclusion of the contract to the commissioning of the facility.
3. Working documentation: "Engineering protection against groundwater flooding of buildings and structures of the projected residential district of Vostochnoye Biryulyovo, Moscow", 2007. New construction. Participation in the project as a HYPE / author of technical solutions, from the conclusion of the contract to the commissioning of the facility;
4. Correction of working documentation: "Engineering protection of the Imereti lowland territory", 2010. New construction. The area of the territory is 1240 ha. PIR budget: 400 million rubles. Participation in the project as a HYPA: Study, analysis of RP, preparation of tender documentation, TOR, PIR estimates, Contract, PIR calendar plan, selection of subproject and survey organizations, participation in negotiations with the Customer;
5. Working documentation: "Engineering protection from hazardous geological processes and phenomena of the object "Cable car 3S from the confluence of the rivers Mzymta and Psluh to the finish zone of the ski resort "Rosa Khutor", from the finish zone of the ski resort "Rosa Khutor" to the Mountain Olympic Village with the arrangement of turning platforms and parking lots, bridge crossings for access to stations of the cable car and walking routes (design and survey work, construction)". New construction, 2012. Participation in the project as a HYPA of GTS facilities: from the conclusion of the contract to the commissioning of the facility.
6. Working documentation: "Passenger berth in the area of the Severnoye Tushino Park on 46.65 km of the ship's course of the Khimki reservoir." New construction. 2013. The length of the structure is 130m. Participation in the project as a HYPE / author of technical solutions: from the conclusion of the contract to the commissioning of the facility.
7. Working documentation: "Measures for the engineering protection of the territory from landslide processes at the base of the support No. 104 of the 220 kV overhead line at the Psou-Settlement site, Adler district, Sochi." New construction, 2013. Participation in the project as a GIP: from the conclusion of the contract to the commissioning of the facility.
8. Project of organization of construction on the object: "DNUR of the cargo area of the port of Sochi at the mouth of the Mzymta river, transportation of soil by refilling with subsequent alluvium into the body of the bulk cargo berth". New construction, 2011. DNUR area: 550x100m. The total volume of DNUR: 177000m3. The design mark of the bottom of the water area: -9.2 m. (BS). The place of the dump of the soil: the body of the berthing structure of bulk cargo (design length: 478m., width: 32m., working alluvial mark: +1.2 (BS). The range of soil transportation along the shore: 800-1500m., in the water area: 500-1000m. Participation in the project as the author of project solutions.
9. Working documentation: "Water intake node for providing a system of artificial snow formation on the Khocharoyakhk River". New construction, 2019. The capacity of the VSU is 70 liters per second. Participation in the project as an author of design solutions.
10. Project: "Strengthening of the shore of the Vyshnevolotsky reservoir with the installation of berthing facilities along Mayakovsky St., Krasnomaysky village, Vyshnevolotsky GO, Tver region". New construction, 2019. The project has developed constructive and space-planning solutions for structures that ensure the operation of Progress-type vessels in the coastal zone of the Vyshnevolotsky reservoir, as well as measures to strengthen the coastline in order to protect it from deformation processes, improve the coastal zone and give the shore an architectural and landscape shape.
11. Project: Liquidation of the object "Hydraulic engineering structure on Lake Dzyhra in the Adler district of Sochi, Krasnodar Territory", 2020. Participation in the project as an author of design solutions.
12. Project: "Construction of hydraulic structures in the coastal strip of the Kuban River on a private plot of Kubanstroevskaya str. 42, Kozet village, Republic of Adygea". The project has developed structural and space-planning solutions for structures providing lifting and launching of vessels of the SunCatcher ELITE 324 SS pontoon type. New construction, 2020. The project also developed measures to protect the coastal strip from deformation of channel processes, as well as structures that ensure the organization of the coastal territory of the construction site. Participation in the project as an author of design solutions.
13. Development of project documentation for the Water Intake facility on the Mamikhdon River, to provide a system of artificial snow formation on the territory of the All-Season tourist and recreational complex "Mamison", Republic of North Ossetia-Alania. New construction, 2019. The capacity of the VSU is 420 cubic meters per hour. New construction, 2022. Participation in the project as the author of project solutions.
14. Development of project documentation for the object "All-season tourist and recreational complex "Elbrus", Kabardino-Balkarian Republic. The system of artificial snow formation on the Baksan River". New construction, 2022. The capacity of the VSU is 110 liters per second. Participation in the project as the author of project solutions.
- Work experience as a project manager:
1. Organization of a complex of works of construction production, including a feast on the formation of artificial reservoirs at the facility: "Engineering protection of the territory of the Imereti lowland". New construction, 2010. The total volume of DNUR: 150t.m3. The design mark of the bottom of the reservoir: -15m. (BS). Participation in the project: management, quality control of design, construction and installation works at the facility.
2. Organization of production for the extraction of inert materials at an underwater quarry by the method of hydromechanization in Kropotkin, Krasnodar Krai, 2010. Production volume: 200t.m3 per year;
3. Organization of a complex of construction works, including a feast at the facility: "Reconstruction of the mooring wall in the village of Novosteklyane, Onega Lake, Karelia", 2019. The purpose of the object is a berth for passenger transportation by water. The length of the mooring front is 200 meters, the depth at the berth is 5.5 meters with a maximum water level of 1% security. The construction of the structure is a bolverk made of metal sheet piling Larsen 5 UM anchored behind piles made of metal sheet piling Larsen 5 UM.
4. Organization of work on the development of design and estimate documentation and the passage of Glavgosexpertiza on the object: "Cargo berthing complex located in the village of Yara Tigilsky district of the Kamchatka region". Customer CJSC "Vertical", 2022.;
5. Organization of pre-contract work on expert evaluation of the investment object, collection of initial data, development of technical specifications for the creation and development of a transport and logistics hub in the seaport of Feodosia, taking into account the passenger component within the framework of the federal target program “Socio-economic development of the Republic of Crimea and the city of Sevastopol for the period up to 2024. Construction and reconstruction of the port infrastructure facilities of the seaport of Feodosia. Reconstruction of berths No. 2, 3. 2021.;
6. Organization, execution and quality control of expert/design and research works on the restoration of hydraulic structures of the Iset hydroelectric complex for the Sredneuralskaya GRES branch of PJSC Enel Russia, 2022, consisting of:
- Design and survey work on the restoration of the dam structures of the hydraulic structure, including the restoration of the flood spillway pressure and the installation of piezometric wells;
- Design and survey work on the restoration of the structures of the hydraulic structure “Heating mains. Siphon well”;
-b) Design and survey work on the restoration of the structures of the hydraulic structure "Sludge accumulator, sections 1, 2";
c) Design and survey work on the restoration of the structures of the hydraulic structure "Oil trap"
7. Expert assessment of the possibility of replacing a gantry crane with a lifting capacity of 40 tons at berth No. 3 of the Industrial Port of PJSC Severstal, located on the right bank of the Rybinsk reservoir, the city of Cherepovets, 2020.
8. Organization, execution and quality control of design and survey work on the object: "Reconstruction of the hydroelectric complex on Lake Svetly (Svetly Pond) in the Sovetsky district of the Altai Territory". Customer CJSC Altayvodproekt, 2022.
- Work experience in the construction industry:
1. Construction of hydraulic structures of the Yuzhny port (7,8 berth), 2000. The structure is a bolverk made of metal sheet piling of the "Larsen" type, the depth at the berth is 9 m., the length is 300 m. Participation in the position of master. Responsibilities - management, planning, quality control of the CMP.
- Work experience as a technical supervision engineer:
1. Technical control of the Customer service (Louis Dreyfus Commodities company), 2015. The object of construction is a grain terminal at the mouth of the river .Don, Azov, with a cargo turnover of 1 million.a ton per year. The area of responsibility is the berth, the rear part of the structure, the approach waterways. The pier is a sheet pile row with a length of 300 m, the depth at the pier is 5m. Dredging of the water area, approach paths using methods of hydro-mechanization. Engineering preparation of the territory with an area of 15 ha.
2.Technical control of the construction of the port infrastructure facilities of the Murmansk Commercial Port, namely: storm sewers, local sewage treatment plants included in the complex of dust suppression facilities of the 2nd cargo area, 2016;
3. Technical control of the construction of the underwater crossing of the Russia-China gas pipeline across the Heilongjiang/Amur River in the area of HeiHe/Blagoveshchensk, 2016.
Activities as an expert:
- Expert evaluation of the quality of work performed at the facility: "Terminal for the reception, storage and regasification of liquefied gas in the Kaliningrad region. The main gas pipeline, offshore section", 2017;
- Conclusion on the shortcomings of the design documentation for the drainage device at the facility: "Multifunctional residential complex in Krasnaya Str. 176, in Krasnodar, 2 nd turn", 2013;
- CONCLUSION on the technical condition, efficiency and the need to use the existing drainage network, subject to the change in the construction of the underground part of the Trade Center building with a parking lot at the address: Blizhnie Prudishchi village, Leninsky district, Moscow region, 2012.
Dredging works.
1) Development of a Construction Management Plan for the project: "Dredging of the cargo section of the Sochi port at the mouth of the Mzymta River, transportation of soil by hydro-mechanization with subsequent flushing of bulk cargo in the berth hull". New construction. Area R: 550x100m. Total volume: 177000m3. The design mark of the bottom of the water area: -9.2 m (BS). Ground discharge location: bulk cargo berthing structure body (design length: 478m, width: 32M, working level of alluvium: + 1.2 (BS). Distance of soil transportation along the shore: 800-1500m. , in the water area: 500-1000m. Approximate budget: 41 million rubles. Participation in the project as the chief specialist of the designer.
2) Organization of a complex of construction works, including design and survey work, on the formation of artificial reservoirs at the site: "Engineering protection of the territory of the Imereti lowland". New construction. Total amount of dredging: 150 thousand m³. Design mark of the bottom of the reservoir: -15 m. Сompleted tasks: organization, management, quality control of design, construction and installation works at the facility. Production of dredging operations with the use of small hydraulic equipment and floating dredgers. Participation in the project as the project manager;
3) Organization of production for the extraction of inert materials on the underwater quarry by the method of hydromechanization in the city of Kropotkin, Krasnodar Territory. Production of dredging operations with the use of small hydraulic equipment and floating dredgers. Production: 200 tons per year. Participation in the project as the project manager;
4) Technical control of the customer service Louis Dreyfus Commodities. The object of construction is a grain terminal at the mouth of the Don river, in the city of Azov, with a turnover of 1 million tons per year. Area of responsibility - berth, rear part of the structure, approach waterways. The berth is a sheet pile with a length of 300 m, the depth at the quay is 5 m. Dredging of the water area, approaches using hydromechanization methods. Engineering preparation of the territory of 15 hectare. Production of dredging operations with the use of sea floating dredgers. Participation in the project as the technical supervision engineer.
Publication of scientific articles:
- Co-authorship on the topic: "Justification of the design solutions of the engineering protection system from groundwater flooding at the compressor station of the Krasnodaraya compressor station, Russia-Turkey GP." Water supply, water drainage, hydraulic engineering and engineering hydrogeoecology. Collection of works. Issue 11, Moscow, 2007;
- Publication in linkedin.com. Visual inspection of the construction: https://www.linkedin.com/posts/alexey-streltsov-8a63171a6_visual-inspection-of-the-construction-ugcPost-6693071343186980864-Z7zx