Profile
Seeking a position to utilize my skills and abilities in an Industry that offers Professional growth while being resourceful, innovative, and flexible. And accept the challenging position in an organization and grow based on my personal abilities and capabilities to provide effective and efficient services to the best of my knowledge to an organization and want to become a successful and result oriented personnel.
Summary
A highly skilled Petroleum Technician with more than 10 years of field and office experience in Oil&Gas/Chemical construction and servicing, working at several major EPC projects.
Have strong technical skills for quality assured delivery of services at all stages from project inception, planning, and budgeting, to procurement, supply, implementation process supervision and troubleshooting, to testing and commissioning. Possess sound managerial and communication skills required for effective monitoring, guidance, and counselling of project stakeholders.
Comfortable working with normative documentation as ISO, API, ASME. Familiar with BIM, BREEAM, sustainable and “green” construction concepts.
Executive Summary
Taking part in construction, pre-commissioning and commissioning, including:
• Erection, assembly, alignment, adjustment, and startup of rotating equipment (pumps, compressors, expanders, turbo-expanders etc.).
• Participation on SAT.
• Verification of rotational equipment which is the first rotation of mechanical shafts and bearings to ensure balancing and no excessive vibration.
• Assembling of package units (such as Reformer, Start-up Boiler, Cooling Tower etc.).
• Refractory material installation.
• Pre-assembly of steel structures on the ground, erection and assembly of steel structures.
• Filling of the columns and reactors with catalysator and dumped/random damped packing.
• Erection of static equipment (columns, reactors, separators, exchangers, strippers etc.).
• Erection of internal equipment elements (molecular sieve, trays, distribution pipes, filters, strainers etc.).
• Erection of various equipment on the pipeline (such as valves of different types, noise reducers of different types, Instrumentation devices, filters and strainers of different types).
• Equipment acceptance, its pneumatic and hydraulic tests, internal and external inspection.
• Pipe flushing, leak testing, pressure testing and MOP testing.
• Mechanical works on flange connections assembly, Flange Management.
• Ability to read and understand technical documents, e.g. PFD, P&IDs and ISO.
Reference
Xavier Faguer, Mechanical Superintendent, Technip FMC, xavierfaguer@gmail.com, , there is a Personal recommendation letter.
Goodyear Mark, Construction manager, Maire Tecnimont, flexorm@hotmail.com, , there is a personal recommendation on LinkedIn.
Kalinin Dmitry, Construction Manager, JSC Nipigaz, .
Kardanov Alim, Manager of Pre-Commissioning and Commissioning, JSC Nipigaz, kardanov_alim@bk.ru, , .
Salvatore Cassese, Site Manager, Technip FMC, salvatore.cassese@technip.com.
Predrag Stefanovich, Manager of Pre-Commissioning and Commissioning, LLC Velesstroy, fliktor.the.first@gmail.com, +381613300951.
Pablo Morcillo, Superintendent, Maire Tecnimont, , there is a personal recommendation on LinkedIn.