Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Candidate

Male, 61 year, born on 30 July 1963

Great Britain, willing to relocate (Aksay (Kazakhstan), Kurchatov (Kazakhstan), France), prepared for occasional business trips

Lead/Principal Civil/Structural Engineer

Specializations:
  • Design engineer

Employment: full time, part time, project work

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 14 years 5 months

September 2017December 2017
4 months
Robert Bird Group
Senior Structural Engineer
, Senior Structural Engineer, Bank Underground Station Capacity Upgrade, London * Design & review of welded and bolted connections for a temporary works truss supporting two levels of slab in the station box structure. 21 Moorfields, London * Review of existing plate girder and UB grillage welded and bolted connection capacity for placing moving crane on existing ground floor slab over operational underground railway station. Mobile crane used to build support frame for tower crane on building redevelopment. 10 Broadway / New Scotland Yard redevelopment, London * Conceptual design for a temporary truss propping system for retained basement wall. Due to the mass concrete nature of sections of the basement retaining wall, conventional props could not be used. A truss was proposed to distribute the load to the cantilever king post internal excavation `reaction' point. Besides the structural steel truss analysis and design, temporary works construction sequence diagrams were produced. ;
March 2017May 2017
3 months
Bachy Soletanche
Structural Engineer
Thames Tideway East Project, London Super Sewer, London * Interim / short-term contract, assisting with completion of the design of deep, circular diaphragm wall shafts: Greenwich & Earl Pumping Stations drop shafts (17m i.d., 46m & 51m depth respectively) and their intersection with 5m diameter Greenwich connection tunnel and CSO tunnel. ;
November 2015February 2017
1 year 4 months
Principal Structural Engineer
, Principal Structural Engineer, WSP / Parsons - Brinckerhoff, London Bond Street Cross Rail - LUL Underground Station Construction - Modification Project, London * Responsible for designing reinforced concrete cladding facade elements and fixings associated with ventilation shaft and Level+1 perimeter edge beams for Western and Eastern Ticket Halls. Analysed early thermal cracking and reinforcement design of concrete cladding perimeter edge beams plus effects of changes in beam design build ability. ; * Reviewed design for structural steel grillages supporting passenger hoardings / tunnel cladding. ; * Provided Contractor advice on construction changes and QA/QC issues- RFIs, NCR during construction of the deep basement / station box underground buildings. The design of the two station halls / deep boxes and ground - first floor parts of the station building were significantly in advance of the M&E design. Consequently the contractor and services team required guidance where the services openings in slabs, walls and cuts in beams could safely be provided. In addition to this, some structural re-organisation was needed to accommodate lift shafts and stair cases to meet manufacturers and building code requirements etc. ; * On call structural engineer for part of the slip forming of the 32m high rectangular ventilation shaft.
November 2015January 2017
1 year 3 months
WSP / Parsons Brinckerhoff
Principal Structural Engineer
Bond Street Cross Rail - LUL Underground Station Construction – Modification Project, London  Responsible for designing reinforced concrete cladding facade elements and fixings associated with ventilation shaft and Level+1 perimeter edge beams for Western and Eastern Ticket Halls.  Performed the early thermal cracking assessment and reinforcement design of concrete cladding perimeter edge beams.  Reviewed design for structural steel grillages supporting passenger hoardings / tunnel cladding  On call structural engineer for part of the slip forming of the 32m high rectangular ventilation shaft
January 2015October 2015
10 months
Alan Auld Engineering
Engineer
Senior Structural (Tunnel) Engineer, Bank Underground Station Capacity Upgrade, London * Designed Square Works (Tunnel Cross Passage and heading connecting structures portals) for the existing column removal Northern Line platform tunnels and Escalator tunnel and Dockland Light Railway tunnel. ; * Reviewed design for Square Works on Northern and Central Lines (running tunnel - platform tunnels and converted running tunnel to circulating area), Dockland Light Railway and new access shaft. ; * Reviewed and guided the design of the new rectangular MEP Northern Line Cable Shaft circa 30 m in depth, consisting of a rectangular I beam frameworks supported by stub columns, with the steel frames encapsulated in concrete. ;
November 2013March 2014
5 months
Senior Civil - Structural Engineer
Senior Civil - Structural Engineer, KPJV (Fluor,WorleyParsons, Tengiz Chevroil, KING, KGNT), Atyrau & Tengiz Future Growth Project (FGP), Kazakhstan, (FEED, moving into detailed design phase) * Designed rig mats, process buildings, reviewed pipe racks etc. (for a major expansion of oil production at super giant Tengiz field, aiming an increase of further 12 million tons to a total of 36 million tons / year. ;
December 2011May 2012
6 months
GTL Partnership Ltd
Lead Structural Engineer
Lead Structural Engineer, GTL Partnership Ltd, Horsham. Weatherford Oil Tool ME, Garraf Oil Field Development Project, Iraq (detailed design stage) * Performed independent design verification for steel pipe rack `train' structures using STAAD.Pro (V.8i) for foundation design purposes: determining whether costs savings were possible with the foundation design - design load reduction. Reported directly to the client.
June 2008September 2008
4 months
GC Partnership
Senior Structural Engineer
Senior Structural Engineer GC Partnership, London Euston Railway Station re-development (Network Rail) * Performed both design and design checking of a major steel truss with large cantilevers supporting a retail area on the station piazza ; * Assessed the existing station piazza concrete slab/deck and columns structural capacity under the increased loading ; * Completed independent design for the new lift shaft consisting of contiguous pile wall, propping, foundation slab and staircase. ;
April 2008June 2008
3 months
Rathborne & Roche
Senior Structural Engineer
Heathrow Airport Terminal 1 re-development, London * Designed 4.5m cantilevering steel grillage structure supporting two levels of modular office accommodation over No.1, North East Car Park at Terminal 1. ; * Analysed the existing car park r.c. column strengthening and additional building bracing design to resist the increased wind induced sway loading. Jersey Airport Control Tower, Jersey State * Checked the design for the new Airport Control Tower / building structure's reinforced concrete cellular raft foundation, first floor slab, internal columns, shear walls and control tower structure.
May 2007November 2007
7 months
Buro Happold
Senior Civil - Geotechnical Engineer
Alston Science Building, Havard University, Boston, USA. * Performed PLAXIS Finite Element analyses, assessed the diaphragm and sheet pile wall temporary works design options for the building's 14.63m deep basement, covering an area 120m by 140m, constructed by bottom up method. ; * Completed long-term stability assessments of the diaphragm wall - permanent works design, obtaining the raft slab forces and deflection, providing design information for the structural design of the slab reinforcement ;
July 2006October 2006
4 months
Scott Wilson
Senior Civil - Geotechnical Engineer
London Victoria railway Station - London Underground Station upgrade, (London Underground) * Checked tension pile designs for redevelopment of the existing ticket hall & construction of the new one ; * Reviewed non-linear, small strain Finite Difference (FLAC) analysis models of the railway station boxes construction ; * Performed preliminary `Bottom up method' design for Victoria Station's South Ticket Hall extension.
September 2005December 2005
4 months
Capita - Symonds
Senior Civil - Structural Engineer
Dubai Metro, UAE * Reviewed the overall design and construction approach for the station boxes and shallow tunnels, Station Box diaphragm wall design with particular reference to D-wall / slab connection details, durability and waterproofing strategy, verification of contractor design compliance with project specification ;
February 2004October 2004
9 months
Charles Haswell & Partners
Senior Structural Engineer
Dublin Port Tunnel Project, Dublin, Eire. (City of Dublin) * Designed the permanent cast in-situ concrete linings for lay-by enlargements and cross over tunnel at Marino Park, including lining fire resistance design ; * Reviewed the implications of the revised lay-by geometry change at Cloisters and provided detailed technical advice on the permanent lining elements ; * Mentored Graduate and Junior Engineers, along with supervising CAD Technicians
September 2003February 2004
6 months
Multiplex Construction UK Ltd
Senior Civil - Structural Engineer
Senior Civil - Structural Engineer White City Re-development, London * Provided civil / structural engineering management and design support to the principal contractor, Multiplex, representing Multiplex on technical issues at meetings with specialist sub-contractors ; * Reviewed piled retaining wall / foundation designs for the new, London Underground sidings secant CFA pile box / deep basement (275m long, 72m wide, 6.5m deep), the Eastern Retail and Western Overbuild secant and contiguous bored pile deep basement boxes ;
July 2003August 2003
2 months
John Brown Hydrocarbons
Principal Civil - Structural Engineer
De-Kastri Oil Export Terminal, Sakhalin Island, Russian Federation (for Exxon - Mobil, detailed design stage) * Performed seismic structural design, using STAAD-Pro, for steel pipe racks, over pipe platforms and machinery supporting steel structures ; * Reviewed foundation design options for the offshore mooring point / umbilical, including the preferred rock socket piled solution and ballasted skirt option ; * Performed feasibility review for an offshore platform foundations (piled vs. gravity base) for seismic, extreme wind / sea conditions and ice loading ;
January 2003July 2003
7 months
Bridges & Structures Division
Senior Tunnelling - Geotechnical Engineer
& Oct 2004 - Sept 2005 Senior Tunnelling - Geotechnical Engineer W.S. Atkins Metronet SSL track renewal project * Developed Approval in Principle and Structural Appraisal / Assessment Reports for the effect of track renewal works on shallow, cut & cover tunnels, station retaining walls & over bridges. Analysed structures using FLAC and Super-Stress ; * Supervised the Junior Engineers in the survey and assessment of cut & cover tunnels and stations / over bridges Trans4m - London Underground PPP (Bakerloo, Central, Victoria and Sub-Surface lines franchises) * Developed, with others, the structural assessment methodology for both shallow and deep tunnels and reviewed structural assessment reports ; * Mentored Graduate and Junior Engineers in the survey and assessment of running tunnels and stations King's Cross - St. Pancras Railway Station Hub Re-development, London (for Network Rail) * Reviewed developer, consultant & contractor method statements and process management documents in respect to asset protection during the construction of extensive sub-surface works affecting King's Cross & St Pancras Stations Jul - Dec 2002 Senior Civil - Structural Engineer Parsons Energy & Chemicals, London LPG Process Plant & Oil Export Terminal, Sakhalin Island, Russian Federation (for Shell Expro, detailed design stage). * Designed piled foundations including piles, & pile caps etc. for the processing plant, control room and adjacent storage facilities, reviewed concrete building (wall) structure design, with the high regional seismicity requirements. Reviewed design drawings for the buildings elements of the project Sep 2001 - Mar 2002 Senior Civil - Geotechnical Engineer Binnie, Black & Veatch * Designed piled foundations and retaining walls for water treatment industry related infrastructure 2000 - 2001 Senior Geotechnical Engineer Rail Link Engineering (Bechtel) Channel Tunnel Rail Link, CTRL, London. Designed piled foundations & retaining walls and assessed the sprayed concrete service tunnel-lining loading for the Woodgrange and Corsica Street shafts, reviewed design statements for the London Tunnels shafts and Ripple Lane Cut & Cover tunnel. 2000 Senior Geotechnical Engineer Studio Geotecnico Italiano, Milan, Italy * Taiwan High Speed Railway Project (for Taiwanese - Japanese JV, constructing railway). Performed NATM tunnel construction stability assessment analyses for the Chia Shui Tunnel (Contract C220). * AGIP western Libya Gas Project, Libya (for contractor, Technip, building plant, detailed design stage). Designed plant building and equipment foundations onshore and offshore piles for new port jetty facilities. 1997 - 2000 Senior Geotechnical Engineer Brown & Root Engineering & Construction (now Halliburton KBR), UK * Croydon Cable Tunnel Feasibility study (for National Grid). Evaluated different tunnel and shaft construction methods required for the ground conditions encountered; prepared the tunnel construction cost estimate * Seismic Upgrade of Nuclear Submarine facilities / docks, for Royal Devonport Dockyard, UK. Geotechnical Team Leader responsible for seismic stability assessment of nuclear refuelling facilities at Devonport; including the retaining walls, the Low Level Refuelling Facility, the Propulsion Testing Rig areas and the 15 Dock head and walls ;
January 1997January 2000
3 years 1 month
Brown & Root Engineering & Construction (now Halliburton KBR), UK

Other regions

Senior Geotechnical Engineer
• Croydon Cable Tunnel Feasibility study (for National Grid). Evaluated different tunnel and shaft construction methods required for the ground conditions encountered; prepared the tunnel construction cost estimate • Seismic Upgrade of Nuclear Submarine facilities / docks, for Royal Devonport Dockyard, UK. Geotechnical Team Leader responsible for seismic stability assessment of nuclear refuelling facilities at Devonport; including the retaining walls, the Low Level Refuelling Facility, the Propulsion Testing Rig areas and the 15 Dock head and walls
January 1990January 1994
4 years 1 month
Geoservices S.A. (Paris) and Halliburton

Other regions

Hydrocarbon Logging Engineer
• Performed well site geology, monitoring drilling operations and calculated well control (circulating pressure) calculations, including HPHT and Sour Gas Reservoirs, along with sub horizontal drilling and report writing. Worked internationally

Skills

Skill proficiency levels
Project management
Водительское удостоверение категории B
Работа с большим объемом информации
Team management

Driving experience

Own car

Driver's license category B, C

About me

Robert is a Principal Structural Engineer with 26 years’ diverse experience in civil – structural engineering. Robert has been involved in the design verification and design of large to ‘Mega’ sized projects covering oil field facility developments, a North Sea production platform, tunnelling and deep basement building structures, often related with significant railway infrastructure projects, in Italy, Taiwan, the UK and USA. Robert has managed small teams of engineers and represented both client and the contractor on major underground construction projects in the UK, Taiwan and China

Higher education (master)

2014
City University
Analysis & Design of Structures for Fire, Blast & Earthquakes, Master of Science
1995
Imperial College. University of London
Engineering Rock Mechanics, Master of Science
1988
Leicester University
Mineral Exploration & Mining Geology, Master of Science
1987
Strathclyde University
Applied Geology, Bachelor of Science

Languages

EnglishNative


Professional development, courses

2018
Seismic Design of Structures (Buildings & Bridges)
Institution of Structural Engineers (IStructE), Seismic Design of Structures (Buildings & Bridges)
2017
Conceptual Design for Engineers, an Advanced Course for Experienced Practitioners
Institution of Structural Engineers (IStructE)
2011
ABAQUS
Simulia, Introduction to ABAQUS (Standard / Explicit (linear & non linear finite element (F.E.) / CAE (Computer-Aided Engineering)
2010
Project Cost Management
Institution of Civil Engineers (ICE), Estimating, Budgeting & Value

Citizenship, travel time to work

Citizenship: Great Britain

Permission to work: Great Britain

Desired travel time to work: Doesn't matter